Last week, our good friends Michael and Diana came over and helped us cut one part of the screen door. We needed either a miter box (something that makes an exact 90 degree angle cut) or a power miter saw. We didn't have either, and neither did they, but Michael is a wizard with saws and actually cut a straighter line than was cut in the original screen. Go Michael!
We still had the rest of the door to cut and install and decided to wait till this weekend to work on it. Today Alayna and I worked most of the morning on installing the rest of the door, and were fairly close to hanging it by 11am. We only had one melt down! Yes, this is an improvement, and is to be expected in home improvement jobs. (I thought that maybe with the Ik*a dresser we had a break through, but this was an exceptionally difficult project for us. . . one that never would have happened a few years ago!) With much reluctance, Alayna, Mateo and I went outside for a needed break and relaxation in the sun.
Then, fifteen minutes later, we got back to work!
Then, our friends Caroline and Sheila (who are going to watch Mateo so we can have a date on Monday - thank you, thank you, thank you) came over to have some Mateo time prior to Monday. With their wonderful assistance, we finished our labor project. Yah.
I, of course, had lots of fun with the power drill, even though neither Alayna nor Caroline would let me stand on a chair to do any of the up high drilling, and I couldn't really lean down to do the drilling at the bottom edge.
Now we have a lovely screen door for our back porch, and can open the doors without letting in insects and especially mosquitos all summer long, or worrying about lead paint in the window sills.
As for this being a "labor project," I guess it needs to be renamed as a pre-labor project! No news yet, but I'm feeling good and when the time comes, the time comes!